Tempress Technologies

News, Events and Video

 

Stay Tuned…December 30, 2016 | by JK Admin

Dr. Jack Kolle will be presenting at industry conferences in 2017. The conferences and presentation topics will be posted here once finalized....


Read More »

Case History: HydroPull™

Record Number 66 Plugs Drilled in Permian Basin Well in a Single Run with a HydroPull™December 30, 2016 | by JK Admin

Spraberry Trend, Midland County, TX Casing 5 1⁄2” 20 lb KOP 8,400 ft. TVD; PBTD 19,331 ft. MD 2-5⁄8” Coil Tubing 66 Composite Plugs This record job with a major Permian Basin operator involved milling out a total of 66 composite bridge plugs from a...


Read More »

Case History: HydroPull™

65 Composite Plugs Drilled in Permian Basin in a Single Run with a HydroPull™December 30, 2016 | by JK Admin

Spraberry Trend, Midland County, TX Casing 5 1⁄2” 20 lb KOP 8,400 ft. TVD; PBTD 19,163 ft. MD 2-5⁄8” Coil Tubing 65 Composite Plugs This near record well cleanout involved milling out a total of 65 composite bridge plugs from a lateral nearly 10,000 ft....


Read More »

Case History: HydroPull™

50 Composite Plugs Drilled in Midland Basin in a Single Run with a HydroPull™December 30, 2016 | by JK Admin

Spraberry Trend, Midland County, TX Casing 5 1⁄2” 20 lb KOP 8,250 ft. TVD; PBTD 20,277 ft. MD 2-5⁄8” Coil Tubing 50 Composite Plugs This well cleanout involved milling a total of 50 composite bridge plugs from a horizontal lateral almost 10,000 ft. long to...


Read More »

Case History: HydroPull™

65 Composite Plugs Drilled in Midland Basin with Oil States Motors and a HydroPull™December 30, 2016 | by JK Admin

Spraberry Trend, Midland County, TX Casing 5 1⁄2” 20 lb KOP 9,031 ft. TVD; PBTD 19,760 ft. MD 2-5⁄8” Coil Tubing 65 Composite Plugs Oil States motors and the Tempress HydroPull™ milled a total of 65 composite bridge plugs from a horizontal lateral almost 10,000...


Read More »

Case History: HydroPull™

64 Composite Plugs Drilled in Midland Basin in a Single Run with a HydroPull™December 30, 2016 | by JK Admin

Wolfcamp Trend, Midland County, TX Casing 5 1⁄2” 20 lb KOP 8,300 ft. TVD; PBTD 18,674 ft. MD 2-5⁄8” Coil Tubing 64 Composite Plugs This impressive well cleanout involved milling out a total of 64 composite bridge plugs from a lateral nearly 10,000 ft. long...


Read More »

Case History: HydroPull Effectiveness

Demonstrated Hydropull EffectivenessFebruary 5, 2015 | by JK Admin

Case History, McMullen County, TX Casing 5 ½” 23 lb PBTD 15,473’ 2” Coil Tubing 23 8K plugs plus 1 Kill Plug We received this report from the field, once again demonstrating the effectiveness of the HydroPull, saving time and money to our customers. “Our competition...


Read More »

3-well Case Study, Atascosa County, Texas

Milling plugs left in the well by the competitionSeptember 3, 2014 | by JK Admin

Casing 5 ½” 23 lb. PBTD – 15,621′ 2” CT Unit 29 8K plugs Our competition was on the well and unable to reach bottom with their downhole coil agitation tool. They had friction lock up at 14,315’ while pumping 10bbl ultra-lube slugs (2.5 gal...


Read More »

 

“Hammer Time” article appears in July 2013 issue of Oilfield Technology MagazineAugust 28, 2013 | by JK Admin

This article provides an overview of OSES Tempress extended reach and phase separation tools. Hammer Time July 2013...


Read More »