Tempress Technologies

Case Histories

Case History: HydroPull™

Record Number 66 Plugs Drilled in Permian Basin Well in a Single Run with a HydroPull™

December 30, 2016

Spraberry Trend, Midland County, TX Casing 5 1⁄2” 20 lb KOP 8,400 ft. TVD; PBTD 19,331 ft. MD 2-5⁄8” Coil Tubing 66 Composite Plugs This record job with a major Permian Basin operator involved milling out a total of 66 composite bridge plugs from a...


Read More »

Case History: HydroPull™

65 Composite Plugs Drilled in Permian Basin in a Single Run with a HydroPull™

December 30, 2016

Spraberry Trend, Midland County, TX Casing 5 1⁄2” 20 lb KOP 8,400 ft. TVD; PBTD 19,163 ft. MD 2-5⁄8” Coil Tubing 65 Composite Plugs This near record well cleanout involved milling out a total of 65 composite bridge plugs from a lateral nearly 10,000 ft....


Read More »

Case History: HydroPull™

50 Composite Plugs Drilled in Midland Basin in a Single Run with a HydroPull™

December 30, 2016

Spraberry Trend, Midland County, TX Casing 5 1⁄2” 20 lb KOP 8,250 ft. TVD; PBTD 20,277 ft. MD 2-5⁄8” Coil Tubing 50 Composite Plugs This well cleanout involved milling a total of 50 composite bridge plugs from a horizontal lateral almost 10,000 ft. long to...


Read More »

Case History: HydroPull™

65 Composite Plugs Drilled in Midland Basin with Oil States Motors and a HydroPull™

December 30, 2016

Spraberry Trend, Midland County, TX Casing 5 1⁄2” 20 lb KOP 9,031 ft. TVD; PBTD 19,760 ft. MD 2-5⁄8” Coil Tubing 65 Composite Plugs Oil States motors and the Tempress HydroPull™ milled a total of 65 composite bridge plugs from a horizontal lateral almost 10,000...


Read More »

Case History: HydroPull™

64 Composite Plugs Drilled in Midland Basin in a Single Run with a HydroPull™

December 30, 2016

Wolfcamp Trend, Midland County, TX Casing 5 1⁄2” 20 lb KOP 8,300 ft. TVD; PBTD 18,674 ft. MD 2-5⁄8” Coil Tubing 64 Composite Plugs This impressive well cleanout involved milling out a total of 64 composite bridge plugs from a lateral nearly 10,000 ft. long...


Read More »

Case History: SC-HydroPull™ Offshore Asphaltene Cleanout with Coiled Tubing on the Q4000

SC-HydroPull™ Offshore Asphaltene Cleanout

August 24, 2015

The customer had shut in a high-asphaltenic, offshore gas well in early 2010 and wished to clean the well in preparation for temporary abandonment in 2015.  The water depth was 3853-ft and the gas sand was located at 18,225 to 18,338-ft MD.  The production tubing...


Read More »

Case History: HydroPull Effectiveness

Demonstrated Hydropull Effectiveness

February 5, 2015

Case History, McMullen County, TX Casing 5 ½” 23 lb PBTD 15,473’ 2” Coil Tubing 23 8K plugs plus 1 Kill Plug We received this report from the field, once again demonstrating the effectiveness of the HydroPull, saving time and money to our customers. “Our competition...


Read More »

3-well Case Study, Atascosa County, Texas

Milling plugs left in the well by the competition

September 3, 2014

Casing 5 ½” 23 lb. PBTD – 15,621′ 2” CT Unit 29 8K plugs Our competition was on the well and unable to reach bottom with their downhole coil agitation tool. They had friction lock up at 14,315’ while pumping 10bbl ultra-lube slugs (2.5 gal...


Read More »

Case History: SC-HydroPull Stimulation & Cleaning Tool

New record extended reach fill cleanout with coiled tubing – 10,600 foot horizontal

August 28, 2013

Two shallow, extended reach wells on the North Slope of Alaska required fill cleanouts.   The TVD of the first well was 3800 feet with a measured depth of 14,400 feet for a total  horizontal extent of 10,600 feet.   The horizontal extent of the second...


Read More »

Case History: HydroPull

New record extended reach CPB millout – 9260 foot horizontal

August 16, 2013

The customer needed to mill out five composite bridge plugs in the toe of a long horizontal Marcellus Shale.  The well casing was 5-1/2 inch with a vertical depth of 7720 feet and measured depth of 16,982 feet.   This job was completed on 2...


Read More »