Tempress Technologies

News, Events and Video

Case History: HydroPull Effectiveness

Demonstrated Hydropull EffectivenessFebruary 5, 2015 | by JK Admin

Case History, McMullen County, TX Casing 5 ½” 23 lb PBTD 15,473’ 2” Coil Tubing 23 8K plugs plus 1 Kill Plug We received this report from the field, once again demonstrating the effectiveness of the HydroPull, saving time and money to our customers. “Our competition...


Read More »

3-well Case Study, Atascosa County, Texas

Milling plugs left in the well by the competitionSeptember 3, 2014 | by JK Admin

Casing 5 ½” 23 lb. PBTD – 15,621′ 2” CT Unit 29 8K plugs Our competition was on the well and unable to reach bottom with their downhole coil agitation tool. They had friction lock up at 14,315’ while pumping 10bbl ultra-lube slugs (2.5 gal...


Read More »

 

“Hammer Time” article appears in July 2013 issue of Oilfield Technology MagazineAugust 28, 2013 | by JK Admin

This article provides an overview of OSES Tempress extended reach and phase separation tools. Hammer Time July 2013...


Read More »

Case History: SC-HydroPull Stimulation & Cleaning Tool

New record extended reach fill cleanout with coiled tubing – 10,600 foot horizontalAugust 28, 2013 | by JK Admin

Two shallow, extended reach wells on the North Slope of Alaska required fill cleanouts.   The TVD of the first well was 3800 feet with a measured depth of 14,400 feet for a total  horizontal extent of 10,600 feet.   The horizontal extent of the second...


Read More »

Case History: HydroPull

New record extended reach CPB millout – 9260 foot horizontalAugust 16, 2013 | by JK Admin

The customer needed to mill out five composite bridge plugs in the toe of a long horizontal Marcellus Shale.  The well casing was 5-1/2 inch with a vertical depth of 7720 feet and measured depth of 16,982 feet.   This job was completed on 2...


Read More »

Case History: HydroPull

Eliminate Use of Friction-Reducing Beads in the Marcellus ShaleMay 16, 2013 | by Admin

These jobs required milling bridge plugs in 5000 to 6000 ft (1524 to 1829 m) horizontal 5.5-in. (140-mm) casing to 11,700 to 12,000 ft (3566 to 3658 m) MD. Prior to this work, the operator had been specifying friction-reducing beads and chemicals. The wells are...


Read More »

Case History: Acoustic Tools

VibraFlow™April 17, 2013 | by Admin

Fluid-powered, high-intensity well stimulation tool. The VibraFlow™ turbo-acoustic source converts hydraulic power into a powerful high frequency acoustic signal. This powerful source mobilizes fines in the formation near the wellbore and increases acid and chemical reaction rates in the formation near the wellbore. The primary...


Read More »

Case History: Acoustic Tools

NitroBlast™April 17, 2013 | by Admin

High-Intensity Gas-Powered Acoustic Well Stimulation Tool. The NitroBlast™ tool creates high-power (up to 75 kW) sound at 2-20 kHz. Large diameter acoustic reflectors focus the sound on the formation. The tool is gas-driven to keep the well underbalanced during treatment....


Read More »

Case History: JetRotor™

Acid BlastingApril 17, 2013 | by Admin

The JetRotor™ is acid capable and is commonly used as part of an acidizing stimulation. In this application a stimulation head is run to blast the wellbore while squeezing acid into the well. The tool accommodates high flow rates and pressures for acid squeeze stimulations....


Read More »